For multi-site owners & operators

How Much is Your National Contractor Costing You?

A defensible, source-backed estimate of the markup, fees, slow-pay drag, dispute load, and vendor-sprawl admin embedded in the maintenance spend you route through JLL, CBRE GWS, C&W, ABM, or any integrator.

Your portfolio

Defaults are calibrated low. Swap in your real numbers for a sharper estimate.

Advanced assumptions

Estimated annual leakage

$0
range $0$0

Enter your portfolio numbers to see your estimate.

FM spend (annual)
$0
Spend via NC
$0
Leakage as % of spend
0%

Leakage drivers

Mid-band (22% markup)
 
Want the receipts?
PDF report includes formulas, sources, and a ranked driver breakdown.
Book a Review
How we calculated this

We compute five leakage categories from your inputs:

  • Markup spread: TNC × m / (1 + m) — the spread embedded in invoices already paid. Bands at 15 / 22 / 30%.
  • Management fee: TNC × f — disclosed in integrator 10-Ks.
  • Slow-pay carrying cost: TNC × max(DTP−30, 0)/365 × rsub — premium subs price in.
  • Dispute / rework: TNC × d × krework — AP cycles + re-truck-rolls.
  • Vendor sprawl admin: non-NC invoice volume ÷ invoices-per-Full-Time Employee × loaded Full-Time Employee cost.

Sources: JLL / CBRE / C&W / ABM 10-Ks, IFMA O&M benchmarks, FacilitiesNet invoice management studies, Fed Small Business Credit Survey, BLS OES. Full citations are in the downloadable PDF.

© ClearFM · Model v0.1 · Defaults calibrated low; replace with prospect-supplied numbers for live use.